---
title: "status"
description: "Three to seven workstreams, each with a named state, an optional owner and a one-line note, for a programme review or a readiness check."
---

> Documentation Index
> Fetch the complete documentation index at: https://sandrinodm.github.io/deckster/llms.txt
> Use this file to discover all available pages before exploring further.

# status

The `status` layout sets three to seven workstreams in aligned rows: a name, a state, an optional owner and a one-line note on what changed or what needs help. The title states the overall position and the rows make the exceptions easy to find. Use it for a programme review or a launch readiness check.

> **New in v0.6.0**
>
> The `status` layout needs `@deckster/cli` 0.6.0 or later. In 0.5.0, `deck lint` reports `layout: There is no "status" layout.`

## Example

[Live slide: "The network launches today; two decisions remain", slide 176 of the lookbook deck](https://sandrinodm.github.io/deckster/decks/lookbook/#/status-launch)

`decks/lookbook/slides/status-launch.mdx`:

```mdx
---
layout: status
title: The network launches today; two decisions remain
eyebrow: Launch readiness
surface: default
budget: 45s
items:
  - name: Open Network
    status: done
    owner: Tobi Adeyemi
    note: The API opens to every shop today.
  - name: Halyard Parcel
    status: on-track
    owner: Beatriz Lund
    note: The beta now feeds the live network.
  - name: Returns pick-up
    status: at-risk
    owner: Rafael Duarte
    note: Confirm the Q1 handover flow this month.
  - name: New city leases
    status: blocked
    owner: Yusuf Demir
    note: Saltby needs the board approval first.
---

Today's launch is ready; the next wave needs two clear decisions.

<Footnote>Wrenhaul launch review, 3 December 2026. Future milestones remain targets.</Footnote>

<Notes>
`status` with four workstreams, every status value, owners and a one-line update on the default surface; use it for a readiness review where the title states the overall position.
Open Network opens today, and Halyard is already feeding it. The decisions sit in the last two rows: agree how returns reach the hub and approve Saltby's first lease. Neither holds up today's launch.
</Notes>
```

Each workstream in `items:` has a `name`, a `status`, an `owner` and a `note`. The state is a pill that always prints its name, so colour is never the only signal: At risk carries a triangle, Blocked a square, and Done is set back in a muted tone. The body gives the scope of the review and `<Footnote>` its date.

*Slide still: A deep green slide titled 'Sandgate needs power before the February opening' with a one-line context and five rows under the heads Workstream, Status and Update: two Done pills, one On track, one At risk with a triangle and one Blocked with a square, each with a one-line note, and a footnote below.* [Open the slide](https://sandrinodm.github.io/deckster/decks/lookbook/#/status-next-wave)

Five workstreams on `surface: inverse` with no owner, so the Owner column is not drawn and the notes take its width. `reveal: true` brings in one workstream per step; the still shows the last step.

## When to use it

- **The states are the point.** The four are `on-track`, `at-risk`, `blocked` and `done`, and any other value is refused. Use [`table`](https://sandrinodm.github.io/deckster/reference/layouts/table/) for arbitrary exact values, [`columns`](https://sandrinodm.github.io/deckster/reference/layouts/columns/) to group several tasks into lanes, [`timeline`](https://sandrinodm.github.io/deckster/reference/layouts/timeline/) when dates and sequence matter, [`actions`](https://sandrinodm.github.io/deckster/reference/layouts/actions/) for commitments with owners and deadlines, and [`stats`](https://sandrinodm.github.io/deckster/reference/layouts/stats/) for one headline number.
- **Three to seven workstreams.** Split a longer report by programme. A `name` takes up to 24 characters, an `owner` up to 17 and a `note` up to 40, each on one line. The title takes up to 50 characters, the body 14 words and the footnote 16.
- **Rename the words** with `labels`, for example `labels: { name: Team }` when you report teams. It changes the column heads (`name`, `status`, `owner`, `note`) and the four state words, each up to 11 characters. Keys you leave out keep their English defaults.
- **Walk through the report** with `reveal: true`, one workstream per step, and a `[click]` cue in the notes for each. See [builds](https://sandrinodm.github.io/deckster/write-slides/builds/).

## Reference

Frontmatter: `layout: status`; surface: the deck's default; title: required, 50 characters at most; PowerPoint: title-only slide.

A status report of three to seven workstreams from `items:`, each with a name, a labelled state, an optional owner and a one-line note explaining what changed or what needs help. The title states the overall position, and aligned rows make the exceptions easy to scan. Use it for a programme review or a launch readiness check; the pills always name their states, so colour is never the only signal. Use table for arbitrary exact values, columns to group several tasks into lanes, timeline when dates and sequence are the point, actions for commitments with owners and deadlines, or stats for one headline number. The owner column appears only when a workstream names an owner. Use `labels.name: Team` when reporting teams. `reveal: true` introduces one workstream per step.

*Slide still (a lookbook slide in this layout, not the example below): A slide in the status layout: The network launches today; two decisions remain.* [Open the slide](https://sandrinodm.github.io/deckster/decks/lookbook/#/status-launch)

**Slots**

| Slot | Required | Takes | Budget | What goes in it |
| --- | --- | --- | --- | --- |
| `body` | no | text | 14 words | One sentence setting the review date or scope; put the updates in `items:`. |
| `<Footnote>` | no | text | 16 words | The report source or caveat on the bottom line. |

**Frontmatter fields**

| Field | Values | How to use it |
| --- | --- | --- |
| `eyebrow` | text | Write a few words of at most 40 characters, for example `eyebrow: Budget committee`, or leave it out. |
| `items` (required) | text | List 3 to 7 workstreams, each with `name` (up to 24 characters), `status` (on-track, at-risk, blocked or done), optional `owner` (up to 17 characters), and `note` (up to 40 characters). Keep each field to one line. |
| `labels` | default `{"name":"Workstream","status":"Status","owner":"Owner","note":"Update","on-track":"On track","at-risk":"At risk","blocked":"Blocked","done":"Done"}` | Optional replacements for `name` (Workstream), `status` (Status), `owner` (Owner), `note` (Update), `on-track` (On track), `at-risk` (At risk), `blocked` (Blocked) and `done` (Done); each is 1 to 11 characters. Omitted keys keep their English defaults. For example, `labels: { name: Team }`. |
| `reveal` | `true`, `false` (default) | Write `reveal: true` to show the items one per step, in order, or leave it out to show them all at once. |
| `chrome` | `true` (default), `false` | Write `chrome: false` to hide the page number, logo and progress bar on this slide, or `chrome: true` to show them. |

**Example**

```mdx
---
layout: status
title: "Planting is ready; watering needs cover"
eyebrow: Programme review
labels:
  name: Team
  status: Status
  owner: Owner
  note: Update
  on-track: On track
  at-risk: At risk
  blocked: Blocked
  done: Done
items:
  - name: Planting
    status: done
    owner: Dana Okafor
    note: All 300 trees are in the ground.
  - name: Watering
    status: at-risk
    owner: Leah Chen
    note: Two summer routes still need wardens.
  - name: Tree mapping
    status: on-track
    note: The app rollout starts next week.
---

Spring review of the canopy programme.

<Footnote>Urban Forestry Division, March 2027.</Footnote>

<Notes>
Name the watering gap first, then the completed planting and the mapping rollout.
</Notes>
```

## Common mistakes

- **A state the layout does not have.** `complete` is not one of the four, so the slide fails the `schema` check:

  ```console
  $ deck lint launch-review
  decks/launch-review/slides/plans.mdx
    error   schema (plans): items[0].status: Expected "on-track" | "at-risk" | "blocked" | "done", got "complete".
            Fix: List 3 to 7 workstreams, each with `name` (up to 24 characters), `status` (on-track, at-risk, blocked or done), optional `owner` (up to 17 characters), and `note` (up to 40 characters). Keep each field to one line.

  launch-review: 1 error, 0 warnings.
  ```

- **A note that is a paragraph.** A note is one line: "items[1].note: Expected a workstream note of at most 40 characters, got "Ground work starts afte…" (67 characters)." Put the detail in `<Notes>`.
- **Naming an owner on only some rows.** The Owner column is drawn for every row as soon as one workstream has an owner, so the others show an empty cell. Name an owner on all of them or on none.
- **Looking for a field to highlight one row.** `status` has none; the pill marks the exceptions. [`risks`](https://sandrinodm.github.io/deckster/reference/layouts/risks/) has `highlight` and [`actions`](https://sandrinodm.github.io/deckster/reference/layouts/actions/) has `current` for that.

## Related layouts

- [`table`](https://sandrinodm.github.io/deckster/reference/layouts/table/): arbitrary exact values in rows and columns.
- [`columns`](https://sandrinodm.github.io/deckster/reference/layouts/columns/): several tasks grouped into lanes.
- [`timeline`](https://sandrinodm.github.io/deckster/reference/layouts/timeline/): dates and sequence are the point.
- [`actions`](https://sandrinodm.github.io/deckster/reference/layouts/actions/): commitments with an owner and a deadline.
- [`stats`](https://sandrinodm.github.io/deckster/reference/layouts/stats/): one headline number.

Source: https://sandrinodm.github.io/deckster/reference/layouts/status/index.mdx
