---
title: "actions"
description: "Three to six next actions, each with an owner and a due date, to close a review with commitments."
---

> Documentation Index
> Fetch the complete documentation index at: https://sandrinodm.github.io/deckster/llms.txt
> Use this file to discover all available pages before exploring further.

# actions

The `actions` layout sets three to six next actions in aligned columns: what will happen, its owner and its due date, so the audience can scan who does what by when. Use it to close a review with commitments, under a title that states what happens next.

> **New in v0.6.0**
>
> The `actions` layout needs `@deckster/cli` 0.6.0 or later. In 0.5.0, `deck lint` reports `layout: There is no "actions" layout.`

## Example

[Live slide: "Returns training clears the way to close the round", slide 187 of the lookbook deck](https://sandrinodm.github.io/deckster/decks/lookbook/#/actions-launch)

`decks/lookbook/slides/actions-launch.mdx`:

```mdx
---
layout: actions
title: Returns training clears the way to close the round
eyebrow: Next actions
current: 2
reveal: true
budget: 45s
actions:
  - title: Open the network to every shop
    owner: Tobi Adeyemi
    due: 3 Dec 2026
  - title: Train every hub on returns
    owner: Aoife Brennan
    due: Q1 2027
  - title: Close the Series A round
    owner: Ines Kowalczyk
    due: Q1 2027
---

We improve the service in six cities before opening four more.

<Footnote>Owners report progress at the next network review.</Footnote>

<Notes>
`actions` with three commitments, `current: 2` and `reveal: true`; use it to name who does what next and by when.
[click] Tobi owns opening the network today. The console and test keys are ready; the next merchant can book a real drop. [click] Aoife owns returns training in the first quarter. That is the action in progress, because every hub needs the same handover routine before returns go on the next loop. [click] Ines owns closing the round. We improve the service in the cities already live while the funding for four more comes together.
</Notes>
```

Each entry in `actions:` has a `title`, an `owner` and a `due`, all required. `current: 2` marks the second action as the one in progress: its row is lit on the accent surface and an "In progress" badge sits beside its owner. The body is the commitment the actions deliver and `<Footnote>` says who reports progress.

*Slide still: A terracotta slide titled 'Four new cities are ready to launch by June 2027' with six rows under the heads Action, Owner and Due: the second row, Prepare the Mill Green hub, sits on a dark green band with an ochre 'In progress' badge next to its owner, and a footnote sits below the list.* [Open the slide](https://sandrinodm.github.io/deckster/decks/lookbook/#/actions-expansion)

Six actions, the most the layout takes, on `surface: accent` with no context line. The marked row is lit on the inverse surface, because the slide is already on the accent.

## When to use it

- **Someone owns each action and a date closes it.** Use [`steps`](https://sandrinodm.github.io/deckster/reference/layouts/steps/) for the stages of a process without owners, [`columns`](https://sandrinodm.github.io/deckster/reference/layouts/columns/) for work grouped by horizon or status, [`timeline`](https://sandrinodm.github.io/deckster/reference/layouts/timeline/) when dates and milestones tell the story, [`table`](https://sandrinodm.github.io/deckster/reference/layouts/table/) when the rows carry figures or more than three columns, [`status`](https://sandrinodm.github.io/deckster/reference/layouts/status/) for readiness across workstreams, and [`agenda`](https://sandrinodm.github.io/deckster/reference/layouts/agenda/) for the order of a meeting.
- **Three to six actions, one line each.** A `title` takes up to 40 characters, an `owner` (a person or a team) up to 22, and a `due` (a date or a period such as `12 Dec 2026` or `Q1 2027`) up to 16. The slide title takes up to 50 characters, the body 14 words and the footnote 16.
- **Mark the action in progress** with `current:`, the number of one row, from 1 to 6. `badge:` is the label on that row, up to 14 characters, "In progress" by default.
- **Rename the column heads** with `labels`, for example `labels: { owner: Lead }`. The keys are `action`, `owner` and `due`, each up to 12 characters. Keys you leave out keep their English defaults.
- **Bring the commitments in one at a time** with `reveal: true` and a `[click]` cue in the notes for each. See [builds](https://sandrinodm.github.io/deckster/write-slides/builds/).

## Reference

Frontmatter: `layout: actions`; surface: the deck's default; title: required, 50 characters at most; PowerPoint: title-only slide.

Three to six next actions from `actions:`, each with a one-line `title`, an `owner` and a `due` date or period. The action takes the wide first column; owners and dates align in their own columns so the audience can scan who does what by when. The title states what happens next. `current:` marks one action in progress with a badge in the owner column and an accent band, and `reveal: true` brings the rows in one per click. Use it to close a review with accountable commitments; use steps for stages of a process without owners, columns for work grouped by horizon or status, and timeline when dates and milestones tell the story; use table when the rows carry figures or more than three columns, status for readiness across workstreams, and agenda for the order of a meeting.

*Slide still (a lookbook slide in this layout, not the example below): A slide in the actions layout: Returns training clears the way to close the round.* [Open the slide](https://sandrinodm.github.io/deckster/decks/lookbook/#/actions-launch)

**Slots**

| Slot | Required | Takes | Budget | What goes in it |
| --- | --- | --- | --- | --- |
| `body` | no | text | 14 words | One sentence on the commitment these actions deliver. Put actions in `actions:`. |
| `<Footnote>` | no | text | 16 words | A source or caveat on the bottom line. |

**Frontmatter fields**

| Field | Values | How to use it |
| --- | --- | --- |
| `eyebrow` | text | Write a few words of at most 40 characters, for example `eyebrow: Budget committee`, or leave it out. |
| `actions` (required) | text | List 3 to 6 actions, each with `title` (what will be done, up to 40 characters), `owner` (a person or team, up to 22) and `due` (a date or period, up to 16: "12 Dec 2026", "Q1 2027"). Keep each field to one line. |
| `badge` | default `In progress` | The inline label on the current action, up to 14 characters; defaults to "In progress". |
| `labels` | default `{"action":"Action","owner":"Owner","due":"Due"}` | Optional column labels: `action`, `owner` and `due`, each up to 12 characters; defaults to "Action", "Owner" and "Due". |
| `current` | text | Write the number of the action in progress, from 1 to 6, such as `current: 2`, or leave it out. |
| `reveal` | `true`, `false` (default) | Write `reveal: true` to show the items one per step, in order, or leave it out to show them all at once. |
| `chrome` | `true` (default), `false` | Write `chrome: false` to hide the page number, logo and progress bar on this slide, or `chrome: true` to show them. |

**Example**

```mdx
---
layout: actions
title: Planting begins in March once crews are booked
eyebrow: Next actions
current: 2
badge: In progress
labels:
  action: Action
  owner: Owner
  due: Due
actions:
  - title: Confirm the east-side sites
    owner: Dana Okafor
    due: 12 Jan 2027
  - title: Book the planting crews
    owner: Field operations
    due: 26 Jan 2027
  - title: Open the warden sign-ups
    owner: Community team
    due: February 2027
---

Every action has one owner before the season begins.

<Notes>
Confirm each owner and date, then stop on booking the crews: that work is in progress.
</Notes>
```

## Common mistakes

- **A `current` that is past the end of the list.** `current: 5` on three actions is a `schema` error that names the way back:

  ```console
  $ deck lint launch-review
  decks/launch-review/slides/plans.mdx
    error   schema (plans): current: 5 names action 5, but there are 3 actions.
            Fix: Write the number of one of the 3 actions (1 to 3), or leave `current` out.

  launch-review: 1 error, 0 warnings.
  ```

- **Leaving out the date.** An action with no `due` fails with "actions[2].due is required." `owner` is required too: an action nobody owns is not a commitment.
- **A badge with no `current`.** `badge: Late` does nothing on its own, because the badge goes on the row `current` names.

## Related layouts

- [`steps`](https://sandrinodm.github.io/deckster/reference/layouts/steps/): the stages of a process, without owners.
- [`columns`](https://sandrinodm.github.io/deckster/reference/layouts/columns/): work grouped by horizon or status.
- [`timeline`](https://sandrinodm.github.io/deckster/reference/layouts/timeline/): dates and milestones are the story.
- [`table`](https://sandrinodm.github.io/deckster/reference/layouts/table/): rows with figures, or more than three columns.
- [`status`](https://sandrinodm.github.io/deckster/reference/layouts/status/): readiness across workstreams.
- [`agenda`](https://sandrinodm.github.io/deckster/reference/layouts/agenda/): the order of a meeting.

Source: https://sandrinodm.github.io/deckster/reference/layouts/actions/index.mdx
